|
Merlin
General conducted an independent Integrated Assessment Review of Design
Basis Manuals, at Darlington Nuclear Generating Station, for the
Instrument Air System (manuals originally prepared by Atomic Energy of
Canada (AECL) and by Duke Engineering) and Containment Systems (manuals
originally prepared by Ontario Power Generation Inc.) |